It begins with craftsmanship.
Stefan Hirt founds Hirt Metallbau as a sole proprietorship.

HIRT kinetics AG. Production site in Mollis (GL), office in Glattbrugg (ZH). 15 employees.
In 1988, Stefan Hirt founded Hirt Metallbau as a sole proprietorship, converted to Hirt Metallbau AG in 1995, and renamed HIRT kinetics AG in 2023.
Stefan Hirt, Founder. Felix Röscheisen, CEO since 2024, majority shareholder since 2026.
Six product lines, all with vertical opening:
Swipe sideways or use the arrow buttons to see more products.
| Specification | SF 90 | SF XL | SF Special | SF Protect | HF 90 | HF 75 Up/Down |
|---|---|---|---|---|---|---|
| Max. Height | 6 m | 6 m | Unlimited | 2 m | 6 m | 4 m |
| Max. Width | 6 m | 12 m | Unlimited | 5 m | 6 m | 4 m |
| Max. Surface Area | 18 m² | 40 m² | Unlimited | 8 m² | 18 m² | 6 m² |
| Max. Weight | 1.5 t | 3.5 t | Unlimited | 1.5 t | 1.5 t | 300 kg |
| Max. Glass Thickness | 63 mm | 70 mm | Custom | 25 mm | 63 mm | 61 mm |
| Opening Direction | Down | Down | Down | Down | Up | Up/Down |
| Operation | Electric drive | Electric drive | Electric drive | Electric drive | Electric drive | Manual or electric drive |
HF 75 Up/Down: 4 m wide or 4 m high, max. 6 m² surface area.
Highly insulated for use in all climate zones, pneumatic sealing. Tested air permeability, wind load resistance, and watertightness against driving rain.
Post-free retracting fronts, corner solutions also non-right-angled, completely flush thresholds, drivable or invisible in the floor covering. Materials: aluminum, steel, chrome-nickel steel, bronze, wood.
CE conformity is proven by the type examination of Suva. CE conformity with type examination was certified in 2011, and watertightness testing according to EN in 2016.
Over 340 systems in 225 properties in 33 countries – from Hawaii to Jakarta: Egypt, Andorra, Australia, Belgium, Bermuda, Germany, Estonia, France, Great Britain, Indonesia, Italy, Jersey, Canada, Qatar, Croatia, Liechtenstein, Mexico, Monaco, Netherlands, Norway, Austria, Romania, Russia, Sweden, Switzerland, Slovakia, Slovenia, Spain, Czech Republic, Turks and Caicos Islands, Hungary, USA, United Arab Emirates.

It all began with Stefan Hirt’s metal construction company. Lifting windows, retracting fronts, and proprietary systems followed. A company history in five chapters.
Chapter 01 / 1988–1997
From metalwork to vertical movement.
Stefan Hirt founds Hirt Metallbau as a sole proprietorship.

First lifting windows in a café on Limmatplatz (ZH).
Conversion into Hirt Metallbau AG.
First order to develop drop fronts for a villa on Südstrasse in Zurich. They are still in operation today. Ever since, Stefan Hirt has been fascinated by vertical opening and has been developing a portfolio of products with vertical movement as a line of business in its own right.
Chapter 02 / 2002–2010
New countries, new shapes, new materials.
First order abroad, in Germany, for 3 drop fronts in a property on Lake Constance.
First drop front in a “mullion-free” design (Schlossberg in Graz, Austria). (Mullion-free means that no fixed mullion is needed between two adjacent elements; when both are open, the room is completely open; this is made possible by additional guide rails in the ground.)
First drop front as a mullion-and-transom system.
Drop front with the largest surface area at that time (16 × 5 m), weighing 6 tonnes, in Rum, Austria.
First drop fronts with hydraulic drive in St. Moritz (GR).
Installation of the highest drop fronts so far, at 2,263 m above sea level, in Samnaun (GR).
First all-glass drop fronts (structural glazing) in Wels, Austria.
First order in the USA (Fort Worth).
First design with curved glass in Kastanienbaum (LU).
First order in Spain (Marbella).
First orders in Moscow and Romania.
First drop front with a stone façade as a garage door in Herrliberg (ZH).
Chapter 03 / 2011–2016
Experience gives rise to in-house product lines.
Certification of CE conformity with type examination.
Orders in Mallorca and Bermuda.
Longest drop front at that time, 20 m long, in Oberdiessbach (BE).
Largest U-shaped drop front at that time, 5/10/5 m, in Los Angeles (USA).
First order for drop fronts in the UK.
Product development of HIRT kinetics SF 90 with in-house developed system profiles and pneumatic seal.
First HIRT kinetics SF 90 with a corner solution in Egnach (TG).
First order in Australia for HIRT kinetics Protect.
Product development of HIRT kinetics SF XL.
Tightness testing according to EN certified.
Chapter 04 / 2017–2020
From Doha via Los Angeles to London.
First drop front in Doha (Qatar).
Eight drop fronts 7 m high for the Century Plaza Hotel in Los Angeles.
First HIRT kinetics HF 90 hoist front in Winterthur (ZH).
First order in Dubai.
Curved drop fronts for a restaurant on King’s Road / Saatchi Gallery in London.
Major order for 11 drop front elements in Texas (USA).
Chapter 05 / 2021–2026
New leadership and ambitious architecture.
Felix Röscheisen meets Stefan Hirt and recognises the potential of the highly specialised, globally active niche supplier.
Order for a retractable all-glass windbreak wall, 2.5 m high and 24 linear metres long, consisting of 3 elements, in Sardinia (Italy).
Felix Röscheisen becomes co-managing director.
Three polygonal drop fronts over 22 m for the Atmosphere Spa of Hotel Krallerhof in Leogang (Austria), designed by Hadi Teherani.
Major order in Mallorca (Spain) including three retractable stone façades, each 10 m long and weighing 8 tonnes.
Renaming to HIRT kinetics AG reflects the company’s positioning in its name.
Felix Röscheisen becomes CEO.
Expanding the social media presence regularly generates viral hits with over 10 million views on Instagram.
Two retractable concrete walls weighing 7 and 6.2 tonnes by Tadao Andō in Monte Carlo.
Felix Röscheisen takes over the majority shareholding from the Hirt family.
First HF 90 hoist front with an integrated hinged door for a flagship store in Zagreb.
Largest single-element corner installation at that time, with sides 8 m and 16 m long, in Cologny (GE).

A selection of completed projects can be found under Projects.